Site Melbourne Regional Landfill Well ID W5-8 Date Drilled 31-Jan-2024 Responsible Person Approved Drill Depth (mBGL) 36 Completed Drilling Depth (mBGL) 30.3 Well Casing Diameter (mm) 200 Surface R.L. 98.6 Easting 299374.43 Northing 5815800.46 WELL COMPLETION DETAIL Ground/Liner Level ↓ Length of Riser 1.5 Well Seal Length (m) 4 ↑WE L L S E A L ↓
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CUSTOMER INSPECTION/COMMONUICATION DETAILS
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Safe drill depth form approved by Hamid. SafeDrillDepthForm_stage 5_Rev1-FA 23 12 08 CWY.xlsx Hi Hamid,
As discussed could i please get your written approval to cut and install well W5-8 to 30m. Proposed depth was 36m but due to obstructions in hole and potential damage to drill rig we were unable to reach that depth.
Thanks Richard.
Approved.
Kind Regards
Hamid |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08-12-2023 12:00 AM
|
WASTE STREAM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PHOTO COMPLETE WELL | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||