Drill Log #3468
Site
Melbourne Regional Landfill
Well ID
W3-8
Date Drilled
9-Mar-2024
Responsible Person
Approved Drill Depth (mBGL)
13
Completed Drilling Depth (mBGL)
13
Well Casing Diameter (mm)
200
Surface R.L.
82.24
Easting
299764.63
Northing
5815996.48
WELL COMPLETION DETAIL

Ground/Liner Level ↓
Length of Riser
1


Well Seal Length (m)

4

W
E
L
L

S
E
A
L


P
L
A
I
N

P
I
P
E



Length of Plain Pipe (m)

5

Length of Gravel Above Last Perforation (m)
1
↖ Plastic Seal
Yes





Length of Gravel Below Last Perforation (m)


8





G
R
A
V
E
L

0


0


0


0


0


0


0


0


0


0

__________
END CAP





Length of Perforated Pipe (m)


8
WELL COMPLETION SUMMARY

Depths are measurements of Metres Below Ground Level (mBGL) - Ground Level = 0
Completed Drilling Depth (mBGL)
13
Completed Well Casing Depth (m)
13
Well Type
Gas
Location Left Clean
Yes
Well Seal Type
Clay/Bentonite
Plastic Seal Type
N/A
Well Casing Rating (PN)
16
End Cap Type
Butt Welded
Plain Pipe Start Depth (mBGL)
0
Plain Pipe End Depth (mBGL)
5
Perf Pipe Start Depth (mBGL)
5
Perf Pipe End Depth (mBGL)
13
Well Seal Start Depth (mBGL)
0
Well Seal End Depth (mBGL)
4
       
CUSTOMER INSPECTION/COMMONUICATION DETAILS
Safe drill depth form approved by Hamid. Phase 3 SafeDrillDepthForm_Rev0 28.02.24 Batch 3 CWY Checked 24 02 29.xlsx
29-02-2024 12:00 AM
WASTE STREAM
Interval
Start
(mBGL)
Interval
End
(mBGL)
Waste Stream
Other
Photo Thumbail
 
Melbourne Regional Landfill - W3-8  (3 Waste records) 
0 2.5 Capping Material    
       
2.5 13 Other Dry waste. Plastics, rubber, metal.  
PHOTO COMPLETE WELL

Show fields from Show fields from Show fields from a related table