11400
MRL Reroute Main Header Line along Masonary Yard
Cleanaway Waste Management Ltd
Melbourne Regional Landfill
1100-1152 Christies Rd, Ravenhall, Victoria 3023 Australia

Complete
Reroute Main Header Line Through Area B1/B2 (Option 1)
  • Trench, weld and lay main header line 
  • Weld and lay main header line 
  • Repair salvaged main header line 
  • Weld and lay air line
Item Quantity/Size Installation Notes
Main header line (trench) 80 m x 200 mm PN10 Trench at road crossings
Main header line (surface lay) 498 m x 200 mm PN10 Install from existing main header line on cell boundary (stage 1) to knock-out pot near the power station

Install securing mounds along main header line at 20 m – 25 m intervals

Repair salvaged main header line   353 m x 200 mm PN10

 

Existing main header line (353 m x 200 mm ) has been salavaged for reuse – repair sections (butt weld) as required 

Remaining 228 m pipework required for works will be supplied 

Air line 578 m x 40 mm PN16 Replace existing air line

Ramp on grade from stage 1 to condensate tank will be constructed by Boral – any works to alter ramp will incur additional costs

  • No variations
Reroute Main Header Line Along  Masonary Yard (Option 2)
  • Trench, weld and lay main header line 
  • Weld and lay main header line 
  • Repair salvaged main header line  
  • Weld and lay air line
  • Relocate condensate tank
  • Install knock-out pot 
  • Relocate Airwell pump
Item Quantity/Size Installation Notes
Main header line (trench) 80 m x 200 mm PN10 Trench at road crossings
Main header line (surface lay) 705 m x 200 mm PN10 Install from existing main header line on cell boundary (stage 1) to knock-out pot near the power station

Install securing mounds along main header line at 20 m – 25 m intervals

Repair salvaged main header line   353 m x 200 mm PN10 Existing main header line (353 m x 200 mm ) has been salavaged for reuse – repair sections (butt weld) as required

Remaining 432 m pipework required for works will be supplied 

Air line 785 m x 40 mm PN16 Replace existing air line
Condenstate tank 1 x 10,000 L (approx.) Relocate 75 m north east outside area B2 boundary
Knock-out pot 1 x 500 mm x 200 mm Install at new location of condesate tank
Airwell pump 1 x 1000 mm Remove from existing knock-out pot and install in new knock-out pot

Ramp on grade from stage 1 to condensate tank location will be constructed by Boral – any works to alter ramp will incur additional costs

Stage 1 main header line was installed by LMS – location/aligment unknown

Works to locate main header line will be charged at hourly rate of $290.70 and billed separately

  • No variations
Pressure Testing (Option 1)
Item Quantity
Main header line 1 (578 m) 
Air line 1 (578 m)
  • No variations
Pressure Testing (Option 2)
Item Quantity
Main header line 1 (785 m) 
Air line 1 (785 m)
  • No variations
No. Description Scheduled Billing Milestone Complete Complete is checked in the LFG Construction Daily Log
1    
2    
3    
4    
5    
6    
7    
8    
9    
10    
 
Date Issued
Equipment Type
Equipment Serial ID
 
11400  (150 Record records) 
28-FEB-2019 Personal Gas Monitor KA416-1056664
28-FEB-2019 Laser Level X059493
28-FEB-2019   565075
28-FEB-2019 Personal Gas Monitor KA416-1067969
28-FEB-2019   126689
28-FEB-2019 EF Welder 170603320
17-FEB-2019 Personal Gas Monitor KA416-1056664
17-FEB-2019 Personal Gas Monitor KA416-1067969
17-FEB-2019   565075
17-FEB-2019 EF Welder 170603320
17-FEB-2019 Laser Level X059493
17-FEB-2019   126689
21-JAN-2019 EF Welder 170603320
21-JAN-2019   126689
21-JAN-2019   565075
21-JAN-2019 Personal Gas Monitor KA416-1056664
21-JAN-2019 Personal Gas Monitor KA416-1067969
21-JAN-2019 Laser Level X059493
17-JAN-2019 EF Welder 170603320
17-JAN-2019   126689
17-JAN-2019   565075
17-JAN-2019 Personal Gas Monitor KA416-1056664
17-JAN-2019 Laser Level X059493
17-JAN-2019 Personal Gas Monitor KA416-1067969
16-JAN-2019 EF Welder 170603320
16-JAN-2019   126689
16-JAN-2019 EF Welder 170603320
16-JAN-2019   126689
16-JAN-2019 Personal Gas Monitor KA416-1056664
16-JAN-2019 Laser Level X059493
16-JAN-2019   565075
16-JAN-2019 Personal Gas Monitor KA416-1067969
16-JAN-2019 Laser Level X059493
16-JAN-2019   565075
16-JAN-2019 Personal Gas Monitor KA416-1056664
16-JAN-2019 Personal Gas Monitor KA416-1067969
15-JAN-2019   126689
15-JAN-2019 EF Welder 170603320
15-JAN-2019 Personal Gas Monitor KA416-1056664
15-JAN-2019 Personal Gas Monitor KA416-1067969
15-JAN-2019   565075
14-JAN-2019 EF Welder 170603320
14-JAN-2019   126689
14-JAN-2019   565075
14-JAN-2019 Personal Gas Monitor KA416-1067969
14-JAN-2019 Personal Gas Monitor KA416-1056664
13-JAN-2019   126689
13-JAN-2019 EF Welder 170603320
13-JAN-2019 Personal Gas Monitor KA416-1056664
13-JAN-2019   565075
11-JAN-2019   126689
11-JAN-2019 EF Welder 170603320
11-JAN-2019 Personal Gas Monitor KA416-1056664
11-JAN-2019   565075
10-JAN-2019   126689
10-JAN-2019 EF Welder 170603320
10-JAN-2019 Personal Gas Monitor KA416-1056664
10-JAN-2019   565075
09-JAN-2019 EF Welder 170603320
09-JAN-2019   126689
09-JAN-2019   565075
09-JAN-2019 Personal Gas Monitor KA416-1056664
16-DEC-2018 EF Welder 170603320
16-DEC-2018   126689
16-DEC-2018 Personal Gas Monitor KA416-1056664
16-DEC-2018   565075
13-DEC-2018   126689
13-DEC-2018 EF Welder 170603320
13-DEC-2018   565075
13-DEC-2018 Personal Gas Monitor KA416-1056664
12-DEC-2018 EF Welder 170603320
12-DEC-2018   126689
12-DEC-2018   565075
12-DEC-2018 Personal Gas Monitor KA416-1056664
11-DEC-2018 EF Welder 170603320
11-DEC-2018   126689
11-DEC-2018 Personal Gas Monitor KA416-1056664
11-DEC-2018   565075
10-DEC-2018   126689
10-DEC-2018 EF Welder 170603320
10-DEC-2018   565075
10-DEC-2018 Personal Gas Monitor KA416-1056664
09-DEC-2018   126689
09-DEC-2018 EF Welder 170603320
09-DEC-2018   565075
09-DEC-2018 Personal Gas Monitor KA416-1056664
06-DEC-2018 EF Welder 170603320
06-DEC-2018   126689
06-DEC-2018 Personal Gas Monitor KA416-1056664
06-DEC-2018   565075
05-DEC-2018 EF Welder 170603320
05-DEC-2018   126689
05-DEC-2018   565075
05-DEC-2018 Personal Gas Monitor KA416-1056664
04-DEC-2018 EF Welder 170603320
04-DEC-2018 EF Welder 170603320
04-DEC-2018   126689
04-DEC-2018   126689
04-DEC-2018   565075
04-DEC-2018   565075
04-DEC-2018 Personal Gas Monitor KA416-1056664
04-DEC-2018 Personal Gas Monitor KA416-1056664
03-DEC-2018   126689
03-DEC-2018 EF Welder 170603320
03-DEC-2018 Personal Gas Monitor KA416-1056664
03-DEC-2018   565075
29-NOV-2018   126689
29-NOV-2018 EF Welder 170603320
29-NOV-2018 Personal Gas Monitor KA416-1056664
29-NOV-2018   565075
10-SEP-2018 Butt Welder 315mm 18848
10-SEP-2018   126689
10-SEP-2018 Personal Gas Monitor KA416-1067955
10-SEP-2018 EF Welder 30858-SB
09-SEP-2018 Butt Welder 315mm 18848
09-SEP-2018 Butt Welder 315mm 18848
09-SEP-2018   126689
09-SEP-2018   126689
09-SEP-2018 EF Welder 30858-SB
09-SEP-2018 EF Welder 30858-SB
09-SEP-2018 Personal Gas Monitor KA416-1067955
09-SEP-2018 Personal Gas Monitor KA416-1067955
05-SEP-2018 Butt Welder 315mm 18848
05-SEP-2018   126689
05-SEP-2018 EF Welder 30858-SB
05-SEP-2018 Personal Gas Monitor KA416-1067955
04-SEP-2018   126689
04-SEP-2018 Butt Welder 315mm 18848
04-SEP-2018   126689
04-SEP-2018 Butt Welder 315mm 18848
04-SEP-2018   126689
04-SEP-2018 Butt Welder 315mm 18848
04-SEP-2018 Personal Gas Monitor KA416-1067955
04-SEP-2018 EF Welder 30858-SB
04-SEP-2018 EF Welder 30858-SB
04-SEP-2018 Personal Gas Monitor KA416-1067955
04-SEP-2018 Personal Gas Monitor KA416-1067955
04-SEP-2018 EF Welder 30858-SB
02-SEP-2018   126689
02-SEP-2018 Butt Welder 315mm 18848
02-SEP-2018 Personal Gas Monitor KA416-1067955
02-SEP-2018 EF Welder 30858-SB
30-AUG-2018   126689
30-AUG-2018 Butt Welder 315mm 18848
30-AUG-2018   126689
30-AUG-2018 Butt Welder 315mm 18848
30-AUG-2018 EF Welder 30858-SB
30-AUG-2018 Personal Gas Monitor KA416-1067955
30-AUG-2018 EF Welder 30858-SB
30-AUG-2018 Personal Gas Monitor KA416-1067955
 
Date
Team Lead
Work Summary
 
No Daily Log records found
Yes
 
Date
Site Name
Type
Title
Run Job Number
CQA Report
Job Number
Drawing
 
18-JUL-2019 Melbourne Regional Landfill Job GCS As-Built 20190718_MRL_SITE AS BUILT_005_REV K-U 11400 11400 Dwg
No
No
No
Yes
Unable to display report. You do not have sufficient permission.
Russell Clarke
Dean Wilson
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.