13731
Erskine Park GCS Modifications (Day Rates)
Cleanaway Waste Management Ltd
Erskine Park Landfill
85-87 Quarry Rd, Erskine Park, New South Wales 2759 Australia

Complete
Landfill Gas Collection System Installation

Run Energy will:

  • Install knoc-kout pot
  • Install air and leachate riser manifold
  • Install air pump
  • Weld and lay leachate pipe
  • Weld and lay air line 
  • Install in accordance with attached design drawing:
    • Elizabeth Drive Landfill - Elizabeth Drive Fuel Rail - RE-LFG-192 Rev B

Details:

Item Quantity/Size Installation Notes General Arrangement Drawing Reference
Knock-out pot 1 x 1200 mm PN10 
  • Excavate and install in low point of the 400mm ring main to collect condensate prior to the inlets to the flares and power 
  • The knock-out pot will be fitted with a 4-inch x 500mm Airwell pump
    • refer to the attached design drawing for the location
RE-LFG-125 -Three-Way Knockout Pot
Air & leachate riser manifold 1 x 63mm 
  • Install at the knock-out pot location
RE-LFG-143 - Air & Leachate Riser Manifold
Air line 6 m x 63 mm PN16
  • Lay and weld in the common trench with a leachate line to existing knockout pot 
    • refer to the attached design drawing for pipe route
N/A
Leachate line  6 m x 90mm PN10
  • Trench, weld and lay from the existing knockout pot to the new knockout pot
    • refer to the attached design drawing for pipe route
RE-LFG--006 - Trench Detail
Isolation valve 1 x 400 mm gear driven
  • Install on the inlet side of the knock-out pot
RE-LFG-164 - Valve Pits

 

  • No variations
Main Header Line Connections

Run Energy will:

  • Trench, weld and lay main header line
  • Weld and lay main header line
  • Connect header line
  • Install in accordance with attached design drawing:
    • Elzabeth Drive Landfill - Elizabeth Drive Fuel Rail - RE-LFG-192 Rev D

Details:

Item Quantity/Size Installation Notes General Arrangement Drawing Reference
Main header line 2 m x 450 mm PN10
  • Weld and lay to a minimum 2 % grade in from the knockout pot
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Main header line 16 m x 450 mm PN10
  • Weld and lay to a minimum 2 % grade into the knockout po
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection 1 450 mm x 200 mm   PN10
  • Connect 450 mm to 200 mm inlet to Flare 2
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection 2 450 mm x 200 mm   PN10
  • Connect 450 mm to 200 mm flange inlet to the power station
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection 3 450 mm x 200 mm   PN10
  • Reduce from 450 mm to 200 mm to Flare 1
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection 4 355 mm x 355 mm   PN10
  • Connect 335mm header line running to new knockout pot into the existing 355 mm header line running into the existing knock-out pot
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection  5 355 mm x 450 mm   PN10
  • Connect existing knockout pot outlet into the 450 mm fuel rail
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B
Connection  6 450 mm x 200 mm   PN10
  • Connect new knockout pot into 450mm fuel rail
Elizabeth Dive Fuel Rail - RE-LFG-192 Rev B

 

  • No variations
No. Description Scheduled Billing Milestone Complete Complete is checked in the LFG Construction Daily Log
1 T&M - Day Rates   Yes  
2    
3    
4    
5    
6    
7    
8    
9    
10    
 
Date Issued
Equipment Type
Equipment Serial ID
 
No Record records found
 
Date
Team Lead
Work Summary
 
13731 - Erskine Park GCS Modifications (Day Rates)  (2 Daily Log records) 
24-AUG-2023 Richard Andrews Arrive onsite and get Tom inducted.
Look at works to be done, locate pipe and fittings.
Erect 2 manifolds and tie in flow lines.
Install valves on 125mm risers.
Shut down and tie into header.
Restart flare and clean up.
27-JUN-2023 Andrew  Dawson Organized unistrut for manifold
Arrived on site and unloaded all necessary equipment for job
Looked at works on C station 
Works to be done another day
Yes
 
Date
Site Name
Type
Title
Run Job Number
CQA Report
Job Number
Drawing
 
27-SEP-2023 Erskine Park Landfill Job GCS As-Built As built 13731 13731 Dwg
No
No
No
No
Russell Clarke
Dean Wilson
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.