12549 Erskine Park Landfill GCS Modification Erskine Park Landfill
Pick up fittings from Jonesy's.
Go to bunnings and get some gear for job.
Arrive on site and check out pipe and work to be done.
Cut and scrape 400mm pipe, load pipe onto ute.
Request machine to bring down 400mm pipe.
Scrape, cut and remove head from sump 10, weld head onto new pipe. Inspect head for leaks and fill with sikaflex.
Clamp cut and remove flow line, weld valve on flow line extension.
Expose around J trap and cut down and end cap.
Prepare air, leachate and barra trap risers.
Raise well 10 4m and hold in position for weld and cool time. (1h 35m)
Raise flow line 4m and tape to sump as far as we can reach with no machine.
Clamp and cut air and leachate, cut barra trap riser, weld caps onto extensions.
Raise air, leachate and barra trap 3m. Brace with star picket and rope as we have no excavator.
Pack up and take left over pipe and well head up to pipe rack.

To wet to access next work area.
Installation
 
Log - Site Name
Daily Log Date
Item
Size (mm)
Quantity/Length
(no. or m)
 
Erskine Park Landfill 29-NOV-2021 Wells 400 4
Erskine Park Landfill 29-NOV-2021 Leachate Line 90 3
Erskine Park Landfill 29-NOV-2021 Flow Line 90 4
Erskine Park Landfill 29-NOV-2021 Air Line 63 3
TOT         14
Milestones
Main Header Line - 50m x 315mm  excavate & remove Yes  
Optic Fibre - 100m x 12 core remove Yes  
Main Header Line  - 50m x 315mm Reinstate  
Optic Fibre - 100m x 12 core, reinstate  
 
 
 
 
 
 
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.