12197
Erskine Park Landfill GCS Modification
Cleanaway Waste Management Ltd
Erskine Park Landfill
85-87 Quarry Rd, Erskine Park, New South Wales 2759 Australia

Complete
 
Date
Document Type
Document
 
Issued for Construction Drawing Set  (1 Document)  
14-SEP-2020 Issued for Construction Drawing Set Doc
Landfill Gas Collection System Installation

Run Energy will:

  • Expose and remove main header line
  • Trench, weld and lay main header line
  • Trench, weld and lay lateral header line
  • Weld and lay air line
  • Weld and lay leachate line 
  • Install J-traps
  • Install in accordance with the attached design drawing:
    • Gas Collection System Installation - 019-DN-006 - Rev B

Details:

Item Quantity/Size Notes General Arrangement Drawing Reference
Main header line 612 m x 315 m
  • Excavate and remove approx. 612m of the existing main header line
  • Refer to the attached design drawing for pipe route
N/A
Main header line 640 m x 315 mm PN8
  • Trench, weld and lay to a minimum 2 % grade in cap  & waste
  • Utilise removed 315 mm pipe
  • Refer to the attached design drawing for the main header line routes

RE- LFG- 003

RE- LFG- 006

Lateral header line 10 m x 160  mm PN8
  • Trench, weld and lay to a minimum 2 % grade in cap  & waste
  • Install between the proposed main header line and well stations 
    • Refer to the attached design drawing for the lateral header line routes

RE- LFG- 003

RE- LFG- 006

Air Line  640 m x 63 mm PN16
  • Remove and relay in new trench with 315 mm main line
  • Refer to the attached design drawing for the flow line routes

N/A

Leachate line 640 m x 63 mm PN10
  • Remove and relay in new trench with 315 mm main line
  • Refer to the attached design drawing for the flow line routes

N/A

Well Station E 1 x box manifold
  • Move well station E to the North and install on top of 2m mound
  • Refer to that attached design drawing for the approx. locations
N/A
Well Station D 1 x  box manifold
  • Move well station D to the North and install on top of 2m mound
  • Refer to that attached design drawing for the approx. locations
N/A
J-trap 12 x 90 mm 
  • Install in front of well stations E & D  in low point in front of manifold mounds
  • Locations to be confirmed on site subject to grade
  • Refer to that attached design drawing for the approx. locations
RE-LFG-04
  • No variations
No. Description Scheduled Billing Milestone Complete Complete is checked in the LFG Construction Daily Log
1 Mobilise & receive materials (Payment 15%) Day 1 Yes   Yes  
2 Excavate & remove Main Header Line 612m x 315mm Day 2 - Day 8   Yes  
3 Trench & install Main Header line 640m x 315mm (payment 45%) Day 9 - Day 15 Yes   Yes  
4 Trench & install Lateral Header line 10m x 160mm Day 16   Yes  
5 Remove and reinstall Air Line 640m x 63mm Day 16   Yes  
6 Remove and reinstall Leachate Line 640m x 63mm Day 17   Yes  
7 Well Station  E - relocate Day 18   Yes  
8 Well Station D - relocate Day 19   Yes  
9 J-Traps install 12 x 90mm Day 20   Yes  
10 V01-03, GPS & Clean up site (Payment 40%) Day 20 Yes   Yes  
 
Date Issued
Equipment Type
Equipment Serial ID
 
12197  (116 Record records) 
16-DEC-2020 EF Welder 30828-QB
07-OCT-2020 EF Welder 180602579
07-OCT-2020 EF Welder 30828-SB
07-OCT-2020 EF Welder 30330-SB
07-OCT-2020 Generator: Gasoline E3073
07-OCT-2020   565888
07-OCT-2020 Laser Level QM5959
06-OCT-2020 EF Welder 180602579
06-OCT-2020 EF Welder 30828-SB
06-OCT-2020 EF Welder 30330-SB
06-OCT-2020 Generator: Gasoline E3073
06-OCT-2020   565888
06-OCT-2020 Laser Level QM5959
05-OCT-2020 EF Welder 180602579
05-OCT-2020 EF Welder 30828-SB
05-OCT-2020 EF Welder 30330-SB
05-OCT-2020 Generator: Gasoline E3073
05-OCT-2020   565888
05-OCT-2020 Laser Level QM5959
04-OCT-2020 EF Welder 180602579
04-OCT-2020 EF Welder 30828-SB
04-OCT-2020 EF Welder 30330-SB
04-OCT-2020 Generator: Gasoline E3073
04-OCT-2020   565888
04-OCT-2020 Laser Level QM5959
03-OCT-2020 EF Welder 180602579
03-OCT-2020 EF Welder 30828-SB
03-OCT-2020 EF Welder 30330-SB
03-OCT-2020 Generator: Gasoline E3073
03-OCT-2020   565888
03-OCT-2020 Laser Level QM5959
02-OCT-2020 EF Welder 180602579
02-OCT-2020 EF Welder 30828-SB
02-OCT-2020 EF Welder 30330-SB
02-OCT-2020 Generator: Gasoline E3073
02-OCT-2020   565888
02-OCT-2020 Laser Level QM5959
01-OCT-2020 EF Welder 180602579
01-OCT-2020 EF Welder 30828-SB
01-OCT-2020 EF Welder 30330-SB
01-OCT-2020 Generator: Gasoline E3073
01-OCT-2020   565888
01-OCT-2020 Laser Level QM5959
30-SEP-2020 EF Welder 180602579
30-SEP-2020 EF Welder 30828-SB
30-SEP-2020 EF Welder 30330-SB
30-SEP-2020 Generator: Gasoline E3073
30-SEP-2020   565888
30-SEP-2020 Laser Level QM5959
29-SEP-2020 EF Welder 180602579
29-SEP-2020 EF Welder 30828-SB
29-SEP-2020 Generator: Gasoline E3073
29-SEP-2020 Laser Level QM5959
29-SEP-2020 EF Welder 30330-SB
29-SEP-2020   565888
28-SEP-2020 EF Welder 180602579
28-SEP-2020 EF Welder 30828-SB
28-SEP-2020 Laser Level QM5959
28-SEP-2020 Generator: Gasoline E3073
26-SEP-2020 Generator: Gasoline E3073
26-SEP-2020 EF Welder 180602579
26-SEP-2020 EF Welder 30828-SB
25-SEP-2020 EF Welder 180602579
25-SEP-2020 EF Welder 30828-SB
25-SEP-2020 Generator: Gasoline E3073
24-SEP-2020 Generator: Gasoline E3073
24-SEP-2020 EF Welder 180602579
24-SEP-2020 EF Welder 30828-QB
24-SEP-2020 GPS 5913490234
24-SEP-2020 Laser Level QM5959
24-SEP-2020 Personal Gas Monitor KA416-1073242
23-SEP-2020 Laser Level QM5959
23-SEP-2020 EF Welder 30828-QB
23-SEP-2020 Generator: Gasoline E3073
23-SEP-2020 EF Welder 180602579
23-SEP-2020 GPS 5913490234
23-SEP-2020 Personal Gas Monitor KA416-1073242
22-SEP-2020 Generator: Gasoline E3073
22-SEP-2020 EF Welder 180602579
22-SEP-2020 EF Welder 30828-QB
22-SEP-2020 GPS 5908489242
22-SEP-2020 Laser Level QM5959
22-SEP-2020 Personal Gas Monitor KA416-1073242
21-SEP-2020 Laser Level QM5959
21-SEP-2020 Personal Gas Monitor KA416-1073242
21-SEP-2020 GPS 5913490234
21-SEP-2020 Generator: Gasoline E3073
21-SEP-2020 EF Welder 30828-QB
21-SEP-2020 EF Welder 180602579
20-SEP-2020 Generator: Gasoline E3073
20-SEP-2020 Laser Level QM5959
20-SEP-2020 EF Welder 30828-QB
20-SEP-2020 EF Welder 180602579
20-SEP-2020 GPS 5913490234
20-SEP-2020 Personal Gas Monitor KA416-1073242
19-SEP-2020 Generator: Gasoline E3073
19-SEP-2020 EF Welder 180602579
19-SEP-2020 EF Welder 30828-QB
19-SEP-2020 Laser Level QM5959
19-SEP-2020 Personal Gas Monitor KA416-1073242
19-SEP-2020 GPS 5913490234
18-SEP-2020 EF Welder 180602579
18-SEP-2020 EF Welder 30828-QB
18-SEP-2020 Generator: Gasoline E3073
18-SEP-2020 Laser Level QM5959
18-SEP-2020 Personal Gas Monitor KA416-1073242
18-SEP-2020 GPS 5913490234
17-SEP-2020 Laser Level QM5959
17-SEP-2020 EF Welder 180602579
17-SEP-2020 EF Welder 30828-QB
17-SEP-2020 Generator: Gasoline E3073
17-SEP-2020 Personal Gas Monitor KA416-1073242
16-SEP-2020 Generator: Gasoline E3073
16-SEP-2020 EF Welder 180602579
16-SEP-2020 Laser Level QM5959
16-SEP-2020 Personal Gas Monitor KA416-1073242
 
Date
Team Lead
Work Summary
 
12197 - Erskine Park Landfill GCS Modification  (35 Daily Log records) 
02-NOV-2020   Drove to Kimbriki picked up tools and generator the went to Erskine Park.
Exposed leaking leachate line. 
Removed 50mm compression fitting cleaned it up and reinstalled. 
Back filled exposed area.
19-OCT-2020   Filled in more around KOP and tidied area.
Dug down 1m on well 75 and bentonite well and reseal.
Packed up all hire equipment and cleaned site office for off hire.
GPS new J Traps and well station and leachate line.
(Excavator 231 will have daily charge accidently clicked on no daily charge).
Also unsure whether all the Coats stuff will have daily charge as it was off hired first thing in the morning.
18-OCT-2020   Completed site variations.
Finished tidying all work areas.
17-OCT-2020   Back fill J Traps, tidy up area
16-OCT-2020   Dug and installed J Traps on e manifold.
Tidy up batter.
( Add tilt bucket to hire equipment log please)
15-OCT-2020   Continued back filling trenches and cleaning up. 
Tidied up rocks on batter.
14-OCT-2020   Continued back filling trenches and cleaning up.
13-OCT-2020   Continued back filling trenches and cleaning up.
12-OCT-2020   Backfill, compact and tidy up.
11-OCT-2020   Back fill where 355 header line was and reshape batter.
Clean utes.
10-OCT-2020   Expose 355 Header  line through road crossing, remove Header line and air line to drop the pipe by 300mm. Sand up and backfill and reinstate road.

Continue backfilling trench where the 355 pipe was.
09-OCT-2020   Sand and Back fill 355mm main gas line
130m.

Start to backfill trench from where the 355 line was pulled out of.
08-OCT-2020 Richard Andrews Richard flew home.

Mitchell and kieran sanded and backfilled 355mm gas main 100m

Exposed, trenched and hooked up sump to 90mm gas main. Sanded and backfilled.
07-OCT-2020 Richard Andrews Expose around tie in point, dig out last bit of trench and tie in header line.
GPS works.
06-OCT-2020 Richard Andrews Weld and lay flow lines to wells G64 and G65 and connect to new header.
Make, dig and install 1 x J trap.
Organise and pick up fittings for tie in.
Run loads of sand down to tie in point.
Off hire SPH197 14t excavator and tilt bucket.
Excavator OH24308 swapped out for SPH175.
Order and receive 3 truck and dogs of pipe bedding.
Dump truck not running, had someone onsite to repair.

05-OCT-2020 Richard Andrews Weld and lay air from G64 down to tie in point.
Cut and remove 355mm header and lay down to tie in point.
Back filling near exit road.
Reinstate drain near flare.
Trench from G65 and G64 up to new header.
Sand up pipe from barra trap to H073.
Back filling and clean up from KOP to H073.
Start building fill around well stations.
04-OCT-2020 Richard Andrews Shut down and cap 355mm header near flare, cut and cap air line at same location.
Lay out 11 straight lengths of 315mm and weld together with ef couplers.
Cut and remove exposed header line.
Weld and Lay 315mm header from well G64 down to flare.
Pull out 63mm coils.
Sand up pipe from KOP to well 9.
03-OCT-2020 Richard Andrews Finish exposing header.
Connect flow lines to E station and bring online.
Trench across road and down to flare.
Lay header and air across road.
Back fill road crossing.
02-OCT-2020 Richard Andrews Install air and leachate at KOP so ops can reinstall pump.
Join header lengths together between barra trap and road.
Cut and remove E station and install at new location.
Tie E station into new header.
Shut down and tie in header, cap end. E station back online.
Lay air line from barra trap to road.
Start connecting flow lines back to E station.
Expose tie in point.
Continue exposing header.
Pick up 1GE6SH from mechanics.
Pick up fittings from GF and Kenkar.
01-OCT-2020 Richard Andrews Continue exposing header.
Back fill and clean up around well 10.
Cut and cap air and header near G64.
Run loads of sand to trench area.
Remove header and air line.
Lay header from Barra trap to H073.
Work out fittings required for job and pick up from GF.
Work out pipe needed to finish job.
30-SEP-2020 Richard Andrews Continue exposing header line, getting very deep and close to main exit rd.
Pull out coils and lay 90mm leachate from KOP to well 10, tie in new leachate line to existing.
Install risers at barra trap.
Make J trap, expose flow line at well 10, trench weld and lay flow line from header to well 10, dig and install J trap. Tie in.
Trench past E station and up to 2nd rd crossing near G64.
Build pad for E station, expose flow lines and trench up to new pad.
Expose E station.
Expose header near flare, header not adding up with drawing provided.
29-SEP-2020 Richard Andrews Continue exposing 315mm header past E station.
Connect remaining 4 wells to D station and open valves.
Trench from road crossing towards new E station location.
Weld and lay 315mm header and air from D station to barra trap.
Weld and lay 90mm leachate across road.
Make, dig, install and connect barra trap.
Back fill and clean up road crossing.
 
28-SEP-2020 Richard Andrews Tie in D station to header line and cap end of line.
Dig and install 6 x J traps.
Connect 2 flow lines to traps and manifold.
Dig and install KOP.
Shut down, tie in KOP and new header line.
D station back online.
Trench from D station to road crossing.
27-SEP-2020 Richard Andrews Day off.
26-SEP-2020 Richard Andrews Shut down, cut and cap header near E station.
Weld and lay 315mm main header and 63mm air line from tie in point to D station. 
Expose flow lines up to new D station location.
Expose 160mm lateral header, cut and relocate D station.
Remove header from D station to road.
Make J traps.
25-SEP-2020 Richard Andrews Pump out KOP into water trailer and empty on landfill.
Cut and cap air line.
Trench from tie in point to D station.
Remove existing header and air from tie in point to D station.
Expose flow lines at D station.
Keep exposing header towards E station.
Extreme winds throughout the day and rain in late afternoon.

Receive dump truck and excavator.
24-SEP-2020   Richard and Craig arrive on site, run through works with Ben.
Continue exposing 315mm header.
Shut down at 1:30pm.
Cut and cap header at C and D station.
Turn system back on at 2:45pm.
Continue exposing header.
Pick up 63mm end caps to cap air line.
Receive fittings and additional excavator.
23-SEP-2020   Continued exposing main header line. Past road crossing etc.
22-SEP-2020   Continue exposing main header line.
21-SEP-2020   Expose main header line and KOP.
Expose around tie in point.
Survey new header line and peg it out.
20-SEP-2020   Day off.
19-SEP-2020   Continued to expose main header line.
18-SEP-2020   Continue exposing main header line, benched out etc.
17-SEP-2020   Exposing existing header line, benching out current trench. roughly 2.5m deep at current point.
16-SEP-2020   Start day off brief chat with Chris and Paul regarding site works.
Clean container, search through tools etc.
Set up office, toilet, genie and relocate container.
Purchase tools Sydney tools 
Buckets id.
Mud bucket B960
300 B623
600 B617
( once buckets are added just let me know and ill add them to following log)
Yes
 
Date
Site Name
Type
Title
Run Job Number
CQA Report
Job Number
Drawing
 
17-NOV-2020 Erskine Park Landfill Job GCS As-Built Sothern Header Line GCS modification 12197 12197 Dwg
No
No
No
No
Russell Clarke
Dean Wilson
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.