Run Energy will:

  • Design the GCS layout (refer attached)
  • Drill & install wells
    • no allowance for steel sleeving of well bore
  • Weld and lay main header line
  • Trench, weld and lay lateral header line
  • Install standalone wellheads
  • Install barometric traps
  • Install in accordance with attached design drawing:
    • Gas Collection System - DRWG 121-DN001 Rev D

Details:

Item Quantity/Size Installation Notes General Arrangement Drawing Reference
Well 3 x 160 mm PN16 
  • Depth approx. 15 m (subject to site conditions)
  • Refer to design drawing for the well locations
RE-LFG-001
Main header line 40 m x 160 mm PN8
  • Weld and lay above ground down the batter
    • refer to the attached design drawing for the proposed route
RE-LFG-005
Lateral header line 124 m x 125 mm PN8
  • Trench, weld and lay to a minimum 2 % grade in waste
    • refer to the attached design drawing for the proposed route

RE-LFG-005

RE-LFG-010

Standalone wellhead 3 x 160 mm
  • Install on top of the well pipe 
  • Complete with an orifice plate and sampling ports
RE-LFG-012
Barometric trap 1
  • Excavate and install barometric trap
    • refer to the attached design drawing for the proposed location
RE-LFG-007
  • No variations
No. Description Scheduled Billing Milestone Complete Complete is checked in the LFG Construction Daily Log
1 Delivery of Materials (30% Payment- $18,625) Day 1 Yes   Yes  
2 Butt weld Stringers Day 1   Yes  
3 Drill 3 wells approx 15m Day 2   Yes  
4 Butt weld and lay 40m x 160mm main header (above ground) Day 3   Yes  
5 Butt weld, lay and trench 124m x 125mm lateral header Day 3 - Day 4   Yes  
6 Install 3 x 160mm standalone wellheads Day 4   Yes  
7 Excavate & install 1 x Bara trap Day 5   Yes  
8 GPS & Clean site (70% Payment- $43,457) Day 5 Yes   Yes  
9    
10    
 
Date Issued
Equipment Type
Equipment Serial ID
 
12012  (13 Record records) 
22-JUN-2020 Generator: Gasoline E3073
22-JUN-2020 EF Welder 30417-QB
21-JUN-2020 Butt Welder 200mm 115400080C
21-JUN-2020 Generator: Gasoline E3073
21-JUN-2020 EF Welder 30417-QB
20-JUN-2020 Generator: Gasoline E3073
19-JUN-2020 Generator: Gasoline E3073
18-JUN-2020 Butt Welder 200mm 115400080C
18-JUN-2020 EF Welder 30417-QB
18-JUN-2020 Generator: Gasoline E3073
17-JUN-2020 Generator: Gasoline E3073
17-JUN-2020 Butt Welder 200mm 115400080C
17-JUN-2020 EF Welder 30417-QB
 
Date
Team Lead
Work Summary
 
12012 - Forest Rd LFG Collection System Expansion  (7 Daily Log records) 
22-JUN-2020   Survey new works on site
Get three 1 inch male poly plugs from Reece 
Source a 90mm compression screw cap to finish of the b trap.
Clean excavator 
Pack up lunch room an container.
Parked up tilt tray with water cart 
Printed out covid -19 Passes for Mitch an Lee 
Lee drive to new chum 
Jay an Mitch drive to Coffs Harbour
21-JUN-2020   Installed 3 x well heads.
Made pads around each well.
Rocked up around each well.
Carted clean fill an backfilled Header line.
Tied new main into existing main.
Restart the flare as we shut it down accidentally when we opened the valve.
Raining on an off!!
20-JUN-2020   Trenched from well D45 to D44, trenched 2m west of D44. Then trenched the 160mm main towards C20 ready for tie in.
Cutt in 2 x 125mm ts for gas extraction reducing down to 63mm.
Teed in the 160mm main to 125mm lateral line.
Backfilled open trench with clean fill, disposed of rubbish coming out of trench to the tip face.
 
19-JUN-2020   Drilled an completed wells D45 an D46
Drilled an installed B - trap at the end of the line.
Trenched from trap to D45 going past D46 on the way.
Hooked up B trap an installed t at well D46 for gas extraction.
Loaded out rubbish from trench an disposed to tip face. Carted clean fill from stockpile on site.
Packed up drill rig ready for transport.
18-JUN-2020   Drilled an completed wells D44

Meters Drilled today: 17.3m

Wells left to drill: 2 
Total meters drilled: 17.3m

Dragged the 3 stringers to well locations
Dropped Bentonite at well locations.
Loaded up clean fill an dumped at well locations.
Disposed of drill waste to tip face.
Made up a B- trap
Exposed the tie in point. 
Loaded up a semi trailer with 160mm perf pipe to take to New Chum
17-JUN-2020   Site inductions 
Butt weld stringers D44, 45 an 46
Butt weld 160mm header line
Butt weld 125mm lateral line 
Unload Civil groups tooling
Delivery's on site.
Truck an dog of rock an pipe bedding delivered 
Pegged out wells, wells were in wrong location. Re marked out wells sent coordinates to Russ to get new locations signed off  by (Sam Swain TRC)
16-JUN-2020   Pick up tools from Erskine park 
Drive to Tamworth Mitch, Lee an Jay
Yes
 
Date
Site Name
Type
Title
Run Job Number
CQA Report
Job Number
Drawing
 
30-JUN-2020 Forest Road Landfill Job GCS As-Built Project as built 12012 12012 Dwg
Yes
 
Date
Well ID
Document
 
No Document records found
 
Well ID
Date Drilled
Easting
Northing
Well Type
Well Casing
Diameter
(mm)
Well Casing
Rating
(PN)
Approved Drill
Depth (mBGL)
Completed Drilling
Depth (mBGL)
Completed Well
Casing
Depth (m)
Well Seal Type
Well Seal Start
Depth (mBGL)
Well Seal
End Depth
(mBGL)
Gravel Start
Depth
(mBGL)
Gravel End
Depth
(mBGL)
Length of
Riser (m)
Plain Pipe
Start Depth
(mBGL)
Plain Pipe
End Depth
(mBGL)
Length of
Plain Pipe
(m) Calc
Perf Pipe Start
Depth (mBGL)
Perf Pipe
End Depth
(mBGL)
Length of Perforated
Pipe (m) Calc
Display Well Profile
 
12012-Forest Rd LFG Collection System Expansion - Forest Road Landfill  (3 Drill Log records) 
D44 18-JUN-2020     Gas 160 16 17.00 17.30 17.00 Bentonite 0.00 3.80 3.80 17.00 1.50 0.00 5.00 5.00 5.00 17.00 12.00
D45 19-JUN-2020     Gas 160 16 17.00 17.40 17.00 Bentonite 0.00 3.90 3.90 17.00 1.50 0.00 5.00 5.00 5.00 17.00 12.00
D46 19-JUN-2020     Gas 160 16 17.00 17.50 17.20 Bentonite 0.00 4.00 4.00 17.20 1.30 0.00 5.20 5.20 5.20 17.20 12.00
TOT             48 51.00 52.20 51.20   0.00 11.70 11.70 51.20 4.30 0.00 15.20 15.20 15.20 51.20 36.00  
No
No
No
Russell Clarke
Dean Wilson
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.