Melbourne Regional Landfill
1100-1152 Christies Rd, Ravenhall, Victoria 3023 Australia

 
Date
Site Name
Type
Title
Run Job Number
CQA Report
Job Number
Drawing
 
05-MAR-2025 Melbourne Regional Landfill Site GCS As-Built MRL As Built - Rev 71     Dwg
28-JAN-2025 Melbourne Regional Landfill Job GCS As-Built As-Built 14515 14515 Dwg
06-NOV-2024 Melbourne Regional Landfill Site GCS As-Built MRL As Built - Rev 69     Dwg
06-NOV-2024 Melbourne Regional Landfill Job GCS As-Built MRL As-Built 14269 14269  
13-SEP-2024 Melbourne Regional Landfill Job GCS As-Built MRL Relocate 450mm Header Line 14439 14439  
13-SEP-2024 Melbourne Regional Landfill Job GCS As-Built MRL Relocate 3A 450mm Header Line 14474 14474 Dwg
10-SEP-2024 Melbourne Regional Landfill Design Drawing MRL   14489 Dwg
05-SEP-2024 Melbourne Regional Landfill Job GCS As-Built 2M well connections 14560 14560 Dwg
03-JUL-2024 Melbourne Regional Landfill Job GCS As-Built MRL Gas Well Installation Phases 3 - 6 14009 14009 Dwg
11-JUN-2024 Melbourne Regional Landfill Site GCS As-Built MRL Cell 3 and 4C Leachate Collection System Installation   14324 Dwg
11-JUN-2024 Melbourne Regional Landfill Site GCS As-Built MRL Cell 2C  Leachate Collection System Installation   14287 Dwg
12-APR-2024 Melbourne Regional Landfill Site GCS As-Built MRL As built - Rev 60     Dwg
15-MAR-2024 Melbourne Regional Landfill Job GCS As-Built As built 14022 14022 Dwg
15-MAR-2024 Melbourne Regional Landfill Job GCS As-Built As built 13122 13122 Dwg
15-MAR-2024 Melbourne Regional Landfill Job GCS As-Built As built 12729 12729 Dwg
21-NOV-2023 Melbourne Regional Landfill Job GCS As-Built As built 11838 11838 Dwg
21-NOV-2023 Melbourne Regional Landfill Job GCS As-Built As built 12068 12068 Dwg
20-NOV-2023 Melbourne Regional Landfill Job GCS As-Built MRL Stage 3 As built 11751 11751 Dwg
13-SEP-2023 Melbourne Regional Landfill Site GCS As-Built As built   12365 Dwg
16-AUG-2021 Melbourne Regional Landfill Site GCS As-Built MRL GCS Asbuilt Rev 42     Dwg
11-AUG-2021 Melbourne Regional Landfill Site GCS As-Built MRL Asbuilt Rev 41     Dwg
10-AUG-2021 Melbourne Regional Landfill Job GCS As-Built MRL Horizontal Well Installation Scope 1 12498 12498 Dwg
05-MAY-2021 Melbourne Regional Landfill Site GCS As-Built MRL - GCS Asbuilt Rev 40     Dwg
31-MAR-2021 Melbourne Regional Landfill Job GCS As-Built As built 12368 12368 Dwg
16-FEB-2021 Melbourne Regional Landfill Job GCS As-Built Stage 3 & 4A project as built 12103 12103 Dwg
11-FEB-2021 Melbourne Regional Landfill Job GCS As-Built MRL - H Station Header 12116 12116 Dwg
01-FEB-2021 Melbourne Regional Landfill Survey Data 2 wells and Header Line     Dwg
02-SEP-2020 Melbourne Regional Landfill Survey Data GCS Installation     Dwg
03-JUL-2020 Melbourne Regional Landfill Job GCS As-Built Leachate Collection System Installation 12082 12082 Dwg
13-MAY-2020 Melbourne Regional Landfill Job GCS As-Built Flow line replacement as built 11973 11973 Dwg
13-MAY-2020 Melbourne Regional Landfill Job GCS As-Built Horizontal as built 11970 11970 Dwg
13-MAY-2020 Melbourne Regional Landfill Site GCS As-Built Gas Collection System - Site Layout - Rev 28     Dwg
29-APR-2020 Melbourne Regional Landfill Site GCS As-Built Resolve Asbuilt     Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11838 11893 Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11836 11836 Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11834 11834 Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11677 11677 Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11482 11482 Dwg
30-MAR-2020 Melbourne Regional Landfill Job GCS As-Built 20190925_MRL_SITE ASBUILT_REV Y 11454 11454 Dwg
03-SEP-2019 Melbourne Regional Landfill Job GCS As-Built Cell 3 GCS Installation 11751   Dwg
03-SEP-2019 Melbourne Regional Landfill Site GCS As-Built Gas Collection System - Site Layout - Rev X 11751   Dwg
18-JUL-2019 Melbourne Regional Landfill Job GCS As-Built 20190718_MRL_JOB AS BUILT_11610_LEACHATE AIR EXTENSION AND REDRILLS 11610 11610 Dwg
18-JUL-2019 Melbourne Regional Landfill Job GCS As-Built 20190718_MRL_SITE AS BUILT_005_REV K-U 11400 11400 Dwg
22-AUG-2018 Melbourne Regional Landfill Job GCS As-Built 20180822_MRL_JOB AS BUILT_11098 - REPLACE KOP - GAS MAINS UPDATE 11098   Dwg
22-AUG-2018 Melbourne Regional Landfill Site GCS As-Built 20180822_MRL_SITE AS BUILT_004_REV K-T     Dwg
22-AUG-2018 Melbourne Regional Landfill zOther DWG - 20180822_MRL_SITE AS BUILT_004_REV K-T     Dwg
22-AUG-2018 Melbourne Regional Landfill Job GCS As-Built 20180822_MRL_JOB AS BUILT_11350 - AUGUST FLOW LINE REPLACEMENT 11350 11350 Dwg
18-JUL-2018 Melbourne Regional Landfill zOther 20180718_MRL_DESIGN DRAWING_ 3B 2ND SET HORIZONTALS     Dwg
02-JUL-2018 Melbourne Regional Landfill zOther DWG - 20180702_MRL_SITE AS BUILT_REV K-T     Dwg
02-JUL-2018 Melbourne Regional Landfill zOther 20180702_MRL_INFLUENCE RADIUS ZONES_REV K-T     Dwg
Result Pages:  1  2    
 
Title
File
Type
Date
Superseded
 
  MRL Gam April 18 2017 (1).dve GA-GEM ID 18-APR-2017 Yes
  MRLGam 16-8-17.dve GA-GEM ID 24-MAY-2017  
  MRL Gam 31-8-18.dve GA-GEM ID 31-AUG-2018  
  Balancing Plan - Nov 2018.xlsm Balancing Plan (site specific) 30-NOV-2018  
  Balancing Plan - Dec 2018.xlsm Balancing Plan (site specific) 31-DEC-2018  
  Balancing Plan - Jan 19.xlsm Balancing Plan (site specific) 31-JAN-2019  
  Balancing Plan - Feb 19.xlsm Balancing Plan (site specific) 26-FEB-2019  
  MRL Balancing Plan - Mar 2019 (1).xls Balancing Plan (site specific) 28-MAR-2019  
  Balancing Plan - May 19.xlsm Balancing Plan (site specific) 30-MAY-2019  
  Balancing Plan - June 19.xlsm Balancing Plan (site specific) 27-JUN-2019  
  Balancing Plan - July19.xlsm Balancing Plan (site specific) 30-JUL-2019  
  Balancing Plan - August 2019.xlsm Balancing Plan (generic) 30-AUG-2019  
  May 2020 MRL Gam file.dve GA-GEM ID 20-MAY-2020  
  MRL GEM Updated IDs 21-06-24.dve GA-GEM ID 21-JUN-2024 Yes
  MRL Elkins Updated IDs 21-06-24.xml Elkins ID 21-JUN-2024  
  MRL GEM Updated IDs 21-06-24.dve GA-GEM ID 21-JUN-2024  
  MRL GEM Updated IDs 05-Dec-23.dve GA-GEM ID 05-DEC-2023  
  MRL GEM Updated IDs 29-10-24.dve GA-GEM ID 29-OCT-2024  
  MRL Elkins Updated IDs 29-10-24.xml Elkins ID 29-OCT-2024  
 
Well ID
Log
 
2019  (21 Drill Log records) 
3-494 / 3A-037 Log
3-505 / 3A-026 Log
3A-002 / 3-490 Log
3A-003/ 3-491 Log
3A-028/ 3-506 Log
3A-029/ 3-501 Log
3A-030/ 3-502 Log
3A-034 / 3-498 Log
3A-036 / 3-493 Log
3B-004 / 3-489 Log
3B-008 / 3-496 Log
3B-010/ 3-500 Log
3B-015 / 3-499 Log
3B-019 / 3-495 Log
3b-029 / 3-503 Log
3B-032 / 3-504 Log
3B-040/ 3-497 Log
B-026 / 3-492 Log
U284 Log
U439 Log
V255 Log
2018  (7 Drill Log records) 
P477 (Old ID P272) Log
Y478  (Old ID Y449) Log
Y480  (Old ID Y325) Log
Y481  (Old ID Z460) Log
Y482  (Old ID Z461) Log
Y483 (Old ID R274) Log
Z479  (Old ID Z331) Log
2017  (4 Drill Log records) 
X456 Log
X457 Log
X458 Log
X459 Log
2016  (1 Drill Log)  
R196 Log
2015  (94 Drill Log records) 
C355 Log
C394 Log
E356 Log
E357 Log
E395 Log
F358 Log
G359 Log
G360 Log
G54B Log
Green Waste #3 Log
H361 Log
H362 Log
H363 Log
H365 Log
H402 Log
H56B Log
H59B Log
Result Pages:  1  2  3  4  5  6  7  8  9    
 
 
1100-1152 Christies Rd
3023
Ravenhall
Victoria
25-OCT-2022
Drawing Records
Unable to display report. You do not have sufficient permission.
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.